Net summer capacity
The maximum output, commonly expressed in megawatts (MW), that generating equipment can supply to a system load, as demonstrated by a multi-hour test, adjusted to ambient weather conditions for summer peak demand (from June 1 through September 30). This output reflects a reduction in capacity attributed to station service or auxiliary equipment requirements. Author: Admin :: Hits: 4 :: Added: Thu Jun 14 2007 ::
Previous