Skip to Content


Home > A > Actual peak reduction

< Previous | Next >

Actual peak reduction


 

The actual reduction in annual peak load (measured in kilowatts) achieved by customers that participate in a utility demand-side management (DSM) program. It reflects the changes in the demand for electricity resulting from a utility DSM program that is in effect at the same time the utility experiences its annual peak load, as opposed to the installed peak load reduction capability (i.e., potential peak reduction). It should account for the regular cycling of energy efficient units during the period of annual peak load.

Admin

Author: Admin :: Hits: 4 :: Added: Wed Jun 13 2007 ::

Review It Rate It Digg Me Bookmark It